{"id":25,"date":"2012-12-20T07:50:47","date_gmt":"2012-12-20T04:50:47","guid":{"rendered":"http:\/\/127.0.0.1\/?page_id=25"},"modified":"2024-07-05T17:36:45","modified_gmt":"2024-07-05T12:36:45","slug":"%d1%80%d0%b5%d0%b0%d0%bb%d0%b8%d0%b7%d0%be%d0%b2%d0%b0%d0%bd%d0%bd%d1%8b%d0%b5-%d0%bf%d1%80%d0%be%d0%b5%d0%ba%d1%82%d1%8b","status":"publish","type":"page","link":"http:\/\/www.mgk.kz\/eng\/?page_id=25","title":{"rendered":"PROJECTS CARRIED OUT"},"content":{"rendered":"<p>During the recent years the Company has realized more than 150 projects for industrial and civil purposes of total amount of more than 1.1 milliard USD, including the Projects for our main Customers:<\/p>\n<table>\n<tbody>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/14_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/14_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a> <a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/15_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/15_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>\u201cTengizchevroil\u201d LLP<\/strong><\/p>\n<p>Work realization period: 2004 \u2014 2024<\/p>\n<ul>\n<li>Offices in TCO Village and Field Operations Offices in Tengiz;<\/li>\n<li>Associated Crude Projects at Tengiz oilfield;<\/li>\n<li>Transport services for transportation of oversize and overweight;<\/li>\n<li>U600 Water Treatment &amp; Disposal (Civil &amp; Mechanical Works);<\/li>\n<li>IB MOA Project \u201cEarly works maintenance shop, substation and utility building\u201d;<\/li>\n<li>TCO WRF Pond Lining Works;<\/li>\n<li>TCO PFU Project;<\/li>\n<li>MS-8 Manifold upgrade;<\/li>\n<li>Stages 1 and 2B. Civil Works DMC;<\/li>\n<li>Aggregate handling at Tengiz Facilities;<\/li>\n<li>Construction of Off-Plot and Intra-Field Haul Roads;<\/li>\n<li>Well infrastructure development;<\/li>\n<li>KTL switchgear upgrade Project &#8212; Fabrication, installation of steel structures and foundation works.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/16_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/16_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>PFD International Ltd\u00a0AB<\/strong><\/p>\n<p>Work realization period: 2002 \u2014 2008<\/p>\n<ul>\n<li>Engineering, Procurement, Construction of rotational camp \u201cShanyrak\u201d for 6520 persons in Tengiz (on the EPC conditions);<\/li>\n<li>Construction of new Western road in Tengiz (on the EPC conditions);<\/li>\n<li>Civil works for fuel gas compressor house in Tengiz;<\/li>\n<li>Off-Plot Civil Works (South Plot);<\/li>\n<li>SGI\/SGP Project pipelines \u2014 Next Generation Gathering System at the Korolev oilfield (Sicim S.p.A \u2013 General Contractor).<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/17_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/17_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>Agip KCO<\/strong><\/p>\n<p>Work realization period: 1999 \u2014 2012<\/p>\n<ul>\n<li>Construction of general education school in Aktau;<\/li>\n<li>Construction of production base in Bautino village;<\/li>\n<li>Plant\u2013site preparation and piling for early oil project Kashagan East oilfield development;<\/li>\n<li>Marine operation support. Mechanical and piping works at Bautino support base;<\/li>\n<li>Engineering, Procurement, Construction Services for Process Liquid Waste Disposal Areas at West Eskene oilfield (on the EPC conditions).<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/18_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/18_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>\u00a0NKTN \u201cKazTransOil\u201d<\/strong><\/p>\n<p>Work realization period: 1996 \u2014 1999<\/p>\n<ul>\n<li>Construction of underwater pipeline section Sai-Utes \u2013 Buzachi through Kaidak bay of Caspian Sea (on the EPC conditions);<\/li>\n<li>Construction of tank farms 20000m3\u04452, 5000m3\u04458 in Mangystau and Atyrau regions (on the EPC conditions).<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/20_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/20_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a> <a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/21_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/21_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>\u201cKarazhanbasmunai\u201d JSC<\/strong><\/p>\n<p>Work realization period: 2000 \u2014 2009<\/p>\n<ul>\n<li>Construction of drilling pads and roads at Karazhanbas oilfield. 1-st and 2-nd stages;<\/li>\n<li>Construction of oil pipeline D 325mm, substation 110\/6 kV, cluster pumping station \u0430t Karazhanbas oilfield;<\/li>\n<li>Construction of associated gas gathering and treatment system \u0430t Karazhanbas oilfield;<\/li>\n<li>Construction of radio communication tower in the area of CETS (Central Engineering-Technological Services) at Karazhanbas oilfield;<\/li>\n<li>Construction of gas-fuel pipeline from Metering Station-34 (MS) to main pipeline DU 200mm, and construction of gas pipeline for transportation of fuel gas from MS-33 to gas distributing main pipeline DU 400mm at Karazhanbas oilfield.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/22_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/22_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a> <a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/23_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/23_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>\u201cKarakudukmunai\u201d LLP<\/strong><\/p>\n<p>Work realization period: 2006 \u2014 2009<\/p>\n<ul>\n<li>Works on Karakuduk oilfield development (commercial oil metering point, group unit No.5, tubing cleaning unit);<\/li>\n<li>Construction of facilities under the project \u201cUtilization of associated gas. Reconstruction of oil gathering and treating system\u201d at Karakuduk oilfield;<\/li>\n<li>Construction of gas transportation pipeline UKPG-TSN at Karakuduk oilfield;<\/li>\n<li>Water storage tank 200m3 at CPC Karakuduk oilfield.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/24_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/24_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>Karachaganak Petroleum Operating BV<\/strong><\/p>\n<p>Work realization period: 1999 \u2014 2001<\/p>\n<ul>\n<li>Earlier civil works at Karachaganak oilfield;<\/li>\n<li>Civil and mechanical-installation works at Karachaganak oilfield.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/25_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/25_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>Buzachi Operating Ltd. Kazakhstan Branch<\/strong><\/p>\n<p>Work realization period: 2002 \u2014 2013<\/p>\n<ul>\n<li>Construction of drilling pads and access roads, OHL 20kW at North Buzachi oilfield;<\/li>\n<li>Camp extension at North Buzachi oilfield;<\/li>\n<li>Construction of well pads, pads for manifold stations and power transmission lines and access roads at North Buzachi oilfield.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/26_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/26_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a> <a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/27_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/27_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>Maersk Oil Kazakhstan GmBH<\/strong><\/p>\n<p>Work realization period: 2008 \u2014 2017<\/p>\n<ul>\n<li>Gas utilization project \u2013 Basic construction and erection works at Dunga oilfield;<\/li>\n<li>Construction of roads and well pads at Dunga oilfield;<\/li>\n<li>Supply of materials, installation, commissioning and testing of 40 pumping units;<\/li>\n<li>Fabrication, installation and piping of pig launcher and pig receiver chambers;<\/li>\n<li>SKID fabrication, installation;<\/li>\n<li>Fiberspar flexible pipe routing;<\/li>\n<li>Establishment and Wellhead Connection, Construction of Oil gathering system (flow lines and collectors) I,M,E lines and J line \u2013 10 wells.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/28_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/28_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a> <a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/29_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/29_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>Total E&amp;P Total Dunga GmbH<\/strong><\/p>\n<p>Work\u00a0realization\u00a0period: 2018 \u2014 2020<\/p>\n<p>SWPWTU&amp;WI SW, including:<\/p>\n<ul>\n<li>Works on repair of equipment and pipelines during production stut-down at Dunga field;<\/li>\n<li>Overhead Lines OHL-10 KV from Dunga-4 Sub-Station to Site PST-10\/6,0 KV;<\/li>\n<li>Installation of Pipeline from Tie-In point to Site PST-01;<\/li>\n<li>Earthworks and Civil Works;<\/li>\n<li>Sea Water Lines Between CGF and PST-01;<\/li>\n<li>Installation of Shlumberger water treatment system equipment \u00a0(for produced, sea water) with a capacity of 30,000 barrels \/ day each;<\/li>\n<li>Installation and Set-Up of Air-Preparation and Nitrogene Generarion Unit;<\/li>\n<li>Electrical Installation Works;<\/li>\n<li>Installation of E-house building (power-generating unit);<\/li>\n<li>Installation of substation PS -10\/6,0 kV;<\/li>\n<li>Installation of compressor house building 495m\u00b2;<\/li>\n<li>Installation of gas treatment facility (producing capacity 240\u00a0000m\u00b3\/day);<\/li>\n<li>Installation of chemical agent injection skids;<\/li>\n<li>Works on installation and \u00a0set-up of instrumentation and control systems.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<hr \/>\n<\/td>\n<\/tr>\n<tr>\n<td><a href=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/30_result.png\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.mgk.kz\/eng\/wp-content\/uploads\/2024\/07\/30_result.png\" alt=\"\" width=\"300\" height=\"190\" \/><\/a><\/td>\n<td><\/td>\n<td><strong>Other Customers<\/strong><\/p>\n<p>Work\u00a0realization\u00a0period: 1995 \u2014 2011<\/p>\n<ul>\n<li>Integrated industrial development of Kalamkas oilfield ( \u201cMangystaumunaigas\u201c JSC);<\/li>\n<li>Construction of oil gathering and treatment installation oil pipeline at Tasbulat oilfield (\u201cTasbulat Oil Corporation\u201d Ltd.);<\/li>\n<li>Construction of access road to \u201cMarine Operations Support Base\u201d in Bautino village (\u201cTeniz Service\u201d Ltd. as General Contractor);<\/li>\n<li>Integrated Gas Treatment Plant at Karabatan oilfield (\u201cCompany Montazhspetsstroy\u201d JSC);<\/li>\n<li>Construction of water pipeline and re-construction of sewage collector in Aktau (Aktau, Capital Construction Department) (on the EPC conditions).<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td colspan=\"3\"><strong>All the facilities were realized by the Company within the periods established by Customers.<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>During the recent years the Company has realized more than 150 projects for industrial and civil purposes of total amount of more than 1.1 milliard USD, including the Projects for our main Customers: \u201cTengizchevroil\u201d LLP Work realization period: 2004 \u2014 2024 Offices in TCO Village and Field Operations Offices in Tengiz; Associated Crude Projects at [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=\/wp\/v2\/pages\/25"}],"collection":[{"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=25"}],"version-history":[{"count":28,"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=\/wp\/v2\/pages\/25\/revisions"}],"predecessor-version":[{"id":467,"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=\/wp\/v2\/pages\/25\/revisions\/467"}],"wp:attachment":[{"href":"http:\/\/www.mgk.kz\/eng\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=25"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}